Central City Ethanol Facility

This photo of this project is in the early phases of construction near Central City, Nebraska. The Strobel team was awarded this contract based on many years of experience in constructing liquid handling facilities and our commitment of completing projects on time. We demonstrated that we are a dedicated earthwork, concrete, and tank erection team. We have the human and equipment resources to meet the demand our customers have come to expect.






Sleepy Eye Overhead Tanks

This project involved fabricating a super structure to support four (4) overhead 6,000 gallon liquid storage tanks near Sleepy Eye, MN.





Musket Fuel Terminal

A new, complete fuel terminal was constructed for Musket Corporation (Love's Travel Center). Top photo shows a large tank foundation with secondary environmental protected 60 mil HDPE linder beneath the storage tank.

Second photo depicts the first transport load of fuel at the new Musket fuel terminal in Kingman, AZ. This facility can off-load a 12,000 to 28,000 gallon train car in 3 hours and load out a truck transporter in approximately 20 minutes.

Final 2 photos are wide shots of another Musket Fuel Terminal in its beautiful Cedar City, UT setting.










Minden Wastewater Treatment Facility

Early stages of Strobel earthwork team on the City of Minden, NE wastewater treatment facility. This project entailed a complete renovation of their wastewater treatment plant.





Plattsmouth Holding Tank

The city of Plattsmouth, NE and Clearwell turned to Strobel Construction for the construction of a 1,000,000 gallon concrete reinforced water holding tank. This structure measured 80'W x 150'L x 12'H and required the utilization of Strobel Construction's experienced concrete team.









Polk Feed Lot Construction

Here you see our earthwork team cutting on-site soil to construct a new feedlot near Polk, NE. This site required us to cut & fill approximately 350,000 CY of soil.





Aurora Travel Center

Construction of a new Love's Travel Center in Aurora, NE. The Strobel Construction erection team completed the structure on time to meet the customer's fast track schedule.





Tank Relocation Projects

Photos depicting Strobel Construction tank relocation projects. The top photo captures the middle stages of a 10 mile haul of a large tank relocation near Central City, NE. Our team works along side the local power companies. Each large liquid storage tank weighed 42 tons. We have found this method of relocation to be of great value to our customers.

The second picture captures a structural tank relocation entering final stages as the Strobel team backs the large liquid tank (30'W x 40'H - 250,000 gallons) into the new concrete containment dike in Red Oak, IA. The Strobel construction team has successfully relocated 50+ tanks in the last several years.






Canton Fertilizer Facility

Another of many projects where we utilized an in-house, pre-engineered super structure which was fabricated in our plant in Clarks, NE and erected by our team on the customer's site in Canton, SD. This structure holds dry fertilizer in overhead tanks.