Central City Ethanol Facility
This photo of this project is in the early phases of construction near Central City, Nebraska. The Strobel team
was awarded this contract based on many years of experience in constructing liquid handling
facilities and our commitment of completing projects on time. We demonstrated that we are
a dedicated earthwork, concrete, and tank erection team. We have the human and equipment
resources to meet the demand our customers have come to expect.
|

|
Sleepy Eye Overhead Tanks
This project involved fabricating a super structure to support four (4) overhead
6,000 gallon liquid storage tanks near Sleepy Eye, MN.
|

|
Musket Fuel Terminal
A new, complete fuel terminal was constructed for Musket Corporation (Love's Travel Center). Top
photo shows a large tank foundation with secondary environmental protected 60 mil HDPE linder beneath
the storage tank.
Second photo depicts the first transport load of fuel at the new Musket fuel terminal in
Kingman, AZ. This facility can off-load a 12,000 to 28,000 gallon train car in 3 hours and
load out a truck transporter in approximately 20 minutes.
Final 2 photos are wide shots of another Musket Fuel Terminal in its beautiful Cedar City, UT setting.
|




|
Minden Wastewater Treatment Facility
Early stages of Strobel earthwork team on the City of Minden, NE wastewater treatment facility.
This project entailed a complete renovation of their wastewater treatment plant.
|

|
Plattsmouth Holding Tank
The city of Plattsmouth, NE and Clearwell turned to Strobel Construction for the construction
of a 1,000,000 gallon concrete reinforced water holding tank. This structure measured 80'W x 150'L
x 12'H and required the utilization of Strobel Construction's experienced concrete team.
|



|
Polk Feed Lot Construction
Here you see our earthwork team cutting on-site soil to construct a new feedlot
near Polk, NE. This site required us to cut & fill approximately
350,000 CY of soil.
|

|
Aurora Travel Center
Construction of a new Love's Travel Center in Aurora, NE. The Strobel Construction
erection team completed the structure on time to meet the customer's fast track
schedule.
|

|
Tank Relocation Projects
Photos depicting Strobel Construction tank relocation projects.
The top photo captures the middle stages of a 10 mile haul
of a large tank relocation near Central City, NE. Our team
works along side the local power companies. Each large liquid
storage tank weighed 42 tons. We have found this method of
relocation to be of great value to our customers.
The second picture captures a structural tank relocation entering
final stages as the Strobel team backs the large liquid tank
(30'W x 40'H - 250,000 gallons) into the new concrete containment
dike in Red Oak, IA. The Strobel construction team has successfully
relocated 50+ tanks in the last several years. |


|
Canton Fertilizer Facility
Another of many projects where we utilized an in-house, pre-engineered super structure
which was fabricated in our plant in Clarks, NE and erected by our team on the customer's
site in Canton, SD. This structure holds dry fertilizer in overhead tanks.
|

|